Sentence examples for vessel decommissioning from inspiring English sources

Exact(1)

Such assistance includes grants made for the purchase of new fishing vessels, vessel decommissioning payments (buybacks), fishermen's unemployment insurance, compensation for closed seasons, equity infusions, and price support programs (Schrank, 2003).

Similar(59)

A new class of carriers, the Gerald R. Ford class, is being constructed to replace previous vessels after decommissioning.

Indeed, in the last few years it has tried to rein in its industrial fishing effort, decommissioning vessels, literally pulling hooks out of the water.

This separation of quota and licences also allowed several POs operating pool systems to buy quota from member vessels that accepted decommissioning payments, preventing quota from leaving the PO.

The New Jersey's ammunition was unloaded in preparation for the vessel's decommissioning in Long Beach, but the ship could not safely go inside the present east and west jetties, according to Navy officials.

In 1994 the Government introduced a provision to enable POs to retain the landings track record of a member vessel whose owner would agree to surrender his licence: in practice the PO would pay financial compensation to the owner for effectively decommissioning his vessel.

On one measure that the industry had strongly supported — a proposal to provide aid to vessel owners who decommission their boats — legislators actually approved contradictory measures, Mr. Garat said, simultaneously approving continued scrapping while denying the necessary funds.

The future size of the world fishing fleet of vessels above 100 GRT will be determined by the rates of decommissioning, losses and construction of new vessels.

After the vessel was pulled out of the water onto a slipway, decommissioning engineers began forming the storage packages – essentially big blocks holing the remainders of the vessel, which will be shipped to long-term storage in Sayda Bay, a refurbished storage site on the coast of Kola Bay where dozens of reactor compartments from other nuclear vessels are kept.

There are numerous features that make decommissioning a challenge, such as the marine environment, the technical limitations of vessels and the lack of specific regulations that determine what should be done, increasing the uncertainty of the process.

The pressure channel design and multi-modular approach eliminates engineering challenges associated with large pressure vessels, and the subcriticality of the modules ensures inherent safety during construction, transportation, and after decommissioning.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: