Sentence examples for total lead time from inspiring English sources

Exact(7)

Total lead time reduction was in the range from 2.6 to 5.5 month depending on investment size.

To shorten the total lead time for products, and to allow disciplined adherence to the master schedule, the functions that feed the assembly process with materials and parts must also become more responsive.

In this case depending on investment size total lead time reduction would be between 3.9 and 18.7 months representing a very significant reduction of 23%–60% compared to the lead time of the conventionally designed reference plant.

The transport lead time is a significant portion of the total lead time, which means that, especially for the MTO segment, its impact on the customers' lead time is substantial.

The average total lead time of raw material n at plant k is calculated as the sum of the raw material lead time and delay time considering all the suppliers, as shown below (Sabri and Beamon 2000): T 4 nk = ∑ v T 1 njk + T 2 nj × 1 - A 1 nj N Open image in new window (3.4).

The following relation gives variance of total lead time of raw material n at plant k: Var T 4 nk = max j V 1 njk + max j V 2 nj 1 – A 1 nj + max j V 2 2 nj 1 – A 1 nj A 1 nj.

Show more...

Similar(53)

The combined use of the IPF and PLUM methods would be more effective at maximizing the total lead times for all the areas, as mentioned by Kodera et al. (2014).

Value stream mapping and discrete event simulation were used to analyse the production system changes, with regards to robustness and total lead-time, to increase knowledge of how to choose change management strategy.

Given all the possible options, the supply chain design problem is to select the options that minimise the total supply chain cost while keeping the total lead-times within required delivery due dates.

Determination of various parameters is given by the following relations (Sabri and Beamon 2000): The total production lead time of product i at plant k is given as the sum of setup time and waiting time at the work stations, processing times, and material delay times: T 5 ik = S ik + P ik + w ik + T 6 ik ∀ i, k Open image in new window (3.14).

Multidisciplinary employees and a high suppliers' reliability were also important in ensuring the optimization of the total production, WIP, lead time (Makspan), and delay.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: