Sentence examples for to construction data from inspiring English sources

Exact(1)

During the design phase, all these data must be transformed to construction data such as principal design choices, material choices, length measures, geometric structures, and tolerances.

Similar(59)

A three-dimensional numerical model of variably-saturated flow was developed with respect to the construction data of the Underground Research Laboratory URLL).

There were 894 redundant DG markers derived from either the same or a closely-linked restriction site that had identical segregation to a marker in the original dataset that were removed prior to genetic map construction (data not shown).

The focus of the latter then shifts to how a construction data visualization environment can support project participant analytical reasoning needs for the management of time, specifically planning/predicting and monitoring/diagnosing/controlling construction conditions and time performance.

FZG and DL participated in the MDM preparation and infection experiments, to SAGE library construction, data analysis and manuscript writing.

Real-time energy management systems that are designed to support consumer supply and demand spectrums of electrical energy continue to face challenges with respect to designing accurate and reliable real-time forecasts due to the stochasticity of model construction data and the model's inability to disseminate both the short- and the long-term electrical energy demand (G) predictions.

New home permits issued in the Twin Cities in April were down about a third from a year earlier, according to Keystone Report, a construction data firm.

Furthermore, this paper presents Evolutionary Web-based Conceptual Cost Estimators (EWCCE) obtained by integrating EFNIM, WWW, and historical construction data to assist in project management.

Generally, the variance term tended to increase with larger construction data set sizes (extreme: LOO-CV) and smaller training data set sizes (extreme: n train  = 51, n test  = 29) (Figure 2).

It has been shown that, by an integrated approach to the optimization of building construction, data centre's intrinsic IT systems and equipment selection is to be done also with the reference to its specific energy efficiency and the most recent breakthroughs in IT infrastructure fields, as well as in data centre's high performance air-conditioning and infrastructure's high precision cooling.

Therefore, this study adopted the mean method, the linear regression method, and the back-propagation neural network (BPN) method to analyze the grout-curtain construction data of the Li-Yu-Tan dam, Taiwan, in order to estimate the cement take needed.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: