Your English writing platform
Discover LudwigSuggestions(1)
Exact(5)
The frequency planning and the timetable development.
This work addresses two activities: timetable development and vehicle-scheduling with different vehicles types.
The public-transport (transit) operation planning process commonly includes four basic activities, usually performed in sequence: network design, timetable development, vehicle scheduling, and crew scheduling.
The public-transport (transit) operation planning process commonly includes four basic activities, usually performed in sequence: (1) network route design, (2) timetable development, (3) vehicle scheduling, and (4) crew scheduling.
They will coordinate the implementation of investments, the drafting of the timetable, development of the terminals and standardisation of regulations.
Similar(55)
There is no timetable for development, and the city is reviewing the public input and determining the next steps.
The history of surface weather analysis concerns the timetable of developments related to surface weather analysis.
The retention period that is aspired to needs to be more clearly defined and aligned with LGU timetables, career development options and succession planning.
What's the development timetable?
Mr. Misek, said that RIM initially tried to merge, or thread, some of its current operating system with QNX to speed up the development timetable.
The strategy is to channel public funds into public amenities, while it is available, and allow market forces to drive the timetable for future development.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com