Your English writing platform
Discover LudwigExact(1)
Consider the issues that may arise, such as low participant attendance, equipment malfunction or inaccurate time estimates for activities.
Similar(59)
Table 3 shows the values of cumulated activity per unit administered activity (i.e., residence time) estimated for patients 1 to 10 as described in the 'Methods' section.
A reasonable time estimate for the whole process?
This figure depicts aggregate time estimates on activities common to all staff, which were used for support cost allocation; time allocation of specific staff on specific activities was used in ingredient cost estimates (Additional file 1).
client: estimate time to completion based on elapsed time, not CPU time (improves estimates for coproc apps).
The time estimates are most accurate for shorter times.
Obtaining time estimates depends on the predictability of the activity.
If one of your time estimates turned out to be unrealistic, allow more time for that activity and cut something less important out of your day.
In both operations, most of the difference in work cycle time estimates were due to differences in the time recorded for delimbing and bucking activities.
ANOVAs of the activity time course estimates for the ROIs and the two latency windows are presented next.
Subsequently, the relative AUC for liver and lesions was calculated as fractions of the image-derived AUC values for WB and converted to cumulative activities per unit of administered activity (residence times) using the probe-derived WB residence time estimates.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com