Your English writing platform
Discover LudwigSuggestions(2)
Exact(4)
The third schedule involved rejuvenation of the specimen above Tg between each measurement.
Power efficiency is used as the third schedule performance indicator and is related to the mean transmit power per packet.
The third schedule ended in May 2012, following which only two songs were remaining, both of which had been scheduled to be shot in Thailand.
The second schedule consisted of inverting the order of exposure of the cells to the different agents, and the third schedule was the simultaneous addition of sapacitabine and a second agent for a period of 48 h.
Similar(55)
The second schedule was conducted in Dubai.
The second schedule of the film was held in Prasad Studios.
The second schedule started on 12 April in Mumbai.
The first schedule, that lasted for 35 days, was completed by January 2012.
The second schedule was shot in Ramoji Film City in Hyderabad.
The next phase was split into two schedules; the first schedule commenced at Filmistan Studios in the first week of September 2010, while the second schedule began in December 2010 and took place over a seven-day period.
One possible amicable solution for the government is to implement the Sixth Schedule in the hill areas.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com