Sentence examples for system with rework from inspiring English sources

Suggestions(1)

Exact(1)

(2013a) developed an imperfect, multi-product production system with rework.

Similar(59)

A model for two-stage manufacturing system with production and rework processes was progressed by Buscher and Lindner (2007).

Our study indicates that the demand is variable and to develop a mathematical model and design an iterative solution procedure to effectively increase productivity and to reduce the expected total cost of an EPQ inventory system involving defective products with rework.

The main contribution of this paper is to develop a mathematical model and design an iterative solution procedure to effectively increase investment and to reduce the expected total cost for EMQ inventory system involving defective products with rework and sales team's initiative-dependent demand in a multiple shipments policy.

Numerical method for determination of the optimal lot size for amanufacturing system with discontinuous issuing policy and rework.

So and Tang (1995) studied an optimal operating policy for a production system with bottleneck and a random rework.

Optimal manufacturing batch size with rework process at single-stage production system.

The final results that we obtained are equivalent to the results that [Jamal, A. A. M., Sarker, B. R., & Mondal, S. (2004). Optimal manufacturing batch size with rework process at single-stage production system. Computers and Industrial Engineering, 47(1), 77 89.] found.

This paper presents a simple derivation of the two inventory policies proposed by [Jamal, A. A. M., Sarker, B. R., & Mondal, S. (2004). Optimal manufacturing batch size with rework process at single-stage production system. Computers and Industrial Engineering, 47(1), 77 89.].

Economic production quantity with rework process at a single-stage manufacturing system with planned backorders.

Cardenas-Barron, Economic production quantity with rework process at a single-stage manufacturing system with planned backorders, Computers and Industrial Engineering 57 (2009) 1105 1113] minimizes the annual total relevant cost TC Q,B) to find the economic production quantity with rework process at a manufacturing system and assumes that TC Q,B) is convex.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: