Suggestions(1)
Exact(5)
In the cast iron water system, we estimated that at least 66±2% S.E. of the DNT was reduced on graphite surface, despite the low graphite content and the lower DNT reduction rate with graphite than with iron.
Here, by simulating the optical geometries in the given condenser lens system, we estimated that the circular area of the focused beam can fully cover a 0.6 × 0.6 cm2 photoactive layer as long as the optical length is less than 10 mm.
Using the performance of the detection system, we estimated the total accumulated number of HIV infections (Ht) as Ht = H0+Hy/p.
Using KPCO's cost management information system, we estimated annualized costs of care for services provided after the index back pain visit by type of utilization resource including outpatient, inpatient, hospital, pharmacy, and CT and MRI radiology procedures for the 24 months following the LBP index visit.
By analyzing the Q- and X-band EPR spectra of this coupled system, we estimated the 3500 MHz value of the isotropic exchange coupling constant, | J0|, which is strong enough to create the SQo FeS triplet state at the lower magnetic field typical of X-band.
Similar(55)
"We estimate that there are currently around 250 solar farms in the UK, and with numerous others in the planning system, we estimate there will be over 1,000 by the end of the decade," said Eustice.
This movement is converted into energy," says Schmehl. "Once implemented into a mass production system, we estimate that our 25 square metre prototype will cost no more than a small vehicle, and it will have the same dimensions," he adds.
As we do not have PayTV service introduced in our DVB-T/T2 system, we estimate service adoption by using analogous service parameter because no sales data are available.
In the case of houses connected to the DH system, we estimate the yearly costs of reservations for infrastructural re-investments at approximately: €146.00 / year · household).
For the PowerUp (initial) mode to be executed on a NoC-based multi-core system, we estimate the dissipated energy and number of violated deadlines during one hyperperiod by allocating runnables and labels to different cores.
For this, there is a difference between houses connected to the DH system and houses with heat pumps: In the case of houses connected to the DH system, we estimate the yearly costs of reservations for infrastructural re-investments at approximately: €146.00 / year · household).
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com