Your English writing platform
Discover LudwigExact(1)
Besides, it contains attributes related to availability, start time, period, and a reference to its operator.
Similar(59)
where i is the number of interest changes, T s - start time of evaluation period, ΔT - the interval to the current position on profile generation time line, and G and T are the current concept group and moment respectively.
The BP starts with the beacon period start time (BPST) which is the start time of the first MAS in the BP, followed by the superframe.
d, depth range of the events used to generate the forecasts; b, b-value of the GR law (Eq. (1)); t0, start time of the learning period; ML, lower cutoff magnitude; S, smoothing parameter.
All pens were videotaped the last 24 h of period 3. Start time (when the goat had its lips round the nipple or the mouth into the water surface in the bowl) and stop time (when the goat moved the lips or mouth away from the dispenser) for every drinking bout for each goat was scored continuously for 24 h with one second accuracy.
Congress sought to prevent those potentially harmed by hazardous waste from being denied a day in court by setting a uniform starting time for the period in which someone may bring legal claims for contamination-caused personal injury or property damage, and that point is when the individual knows or should have known that the contamination was the likely cause of the injury or damage.
Heat of hydration tests results show that 6% MK accelerates the cement hydration, with an advanced accelerating period starting time, and maximize the heat flow which indicates maximum temperature rise.
The optimal model parameters used for the forecasts are estimated by fitting the model to the observation records up to the starting time of the forecasting period, and the probabilities of earthquake occurrences are obtained through simulations.
The uppercase character S is the starting time of the target analysis period to which the model is to be applied, and t i represents the occurrence time of the ith earthquake associated with a magnitude of M i that is greater than the cutoff magnitude M c.
Meanwhile, PEVs start charging from time period 0 00 1 00, an hour earlier than that in summer, to guarantee the battery constraints as well.
(1 where P v is the price of valley period; P p is the price of peak period; t 1 is the start time of valley period; t 2 is the end time of valley period.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com