Your English writing platform
Discover LudwigSuggestions(5)
Exact(4)
Utilization of recycled aggregate (RA) from crushed concrete wastes as alternative to natural aggregate in construction industry solve the construction and demolition waste (C&DW) disposal problems and reduces the gap between the demand and supply.
In this paper, six half-scale exterior beam-column joint connections are casted and tested under cyclic loads to investigate and evaluate the possibility of using high performance fiber reinforced cementitious composites (HPFRCC) to remove the necessity of confining (transverse) reinforcements and solve the construction problems in beam-column joints under seismic loads.
Funded in 2012 by Jimmy Louchart, Joffroy Louchart and David Vauthrin, Finalcad has set out to solve the construction industry's "chronic low productivity" problem.
However, it is not clear how minimal separators can be used to solve the construction problem in a similar time bound.
Similar(56)
Solving the construction side looks easy compared with the human problems that arise when a company grows from 2 people to more than 2,000 in seven years.
As shown in Algorithm 3, we also solve the matrix construction problem by adopting the alternating projection method from the macro perspective.
2) The authors have developed an algorithm to solve the supertree construction problem with time complexity O(n).
nPlan - Co-Founded in 2017 by CEO Dev Amratia, and CTO Alan Mosca, nPlan is aiming to improve the way major construction projects are delivered, using the power of deep learning to solve the problem that construction projects are consistently and critically delayed.
In order to solve the problem of construction ventilation in extra-long tunnel under the context of drilling blasting method and trackless transportation, the construction shaft is used as an air inlet or outlet to better ventilation effect.
In the premise of configured the constitute elements of GEP algorithm, it is expressed by the Visual Basic program to solve the highway engineering construction cost forecasting model.
We solve the c-WSSD construction problem by employing a comparison-based binary tree traversing procedure presented in Algorithm 2. To be specific, let (R cdot )) denote the minimal spanning tree structure of a given subgraph; u, v denote subgraphs of (DT(G_{V'})); (l_u) and (l_v) denote the diameter value of R u) and R v), respectively.
More suggestions(1)
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com