Your English writing platform
Discover LudwigSuggestions(5)
Exact(17)
First a sub-optimal sequence of jobs to be scheduled has been generated.
In permutation flowshops the sequence of jobs is the same on all machines.
Once a sequence of jobs is known, dynamic programming is often adopted to solve the batching problem.
At the first level, a sequence of jobs in each group is determined, while at the second level a sequence of groups themselves is determined.
Traditional approaches to machine scheduling typically address objectives and constraints that govern the relative sequence of jobs being executed using available resources.
In this problem not only should the sequence of jobs be determined but also the formation of batches is considered as a new variable in the model.
Similar(43)
The earliest operating systems consisted of software residing in the computer that handled "batches" of user jobs i.e., sequences of jobs stored on magnetic tape that are read into computer memory and executed one at a time without intervention by user or operator.
A mixed-integer linear programing model is presented, showing that buffers of size n − 2 allow permuting sequences of jobs between stages.
This paper addresses the total completion time minimization in a two-stage differentiation flowshop where the sequences of jobs per type are predetermined.
In an IG algorithm, size d of jobs are removed from a sequence and re-inserted into all possible positions of the remaining sequences of jobs, which affects the performance of the algorithm.
The problem is to determine a processing sequence of the jobs such that the sum of weighted completion times over all groups is minimized.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com