Your English writing platform
Discover LudwigSuggestions(1)
Exact(13)
The first segment of freeway built was a relocated section of US 16 near Coopersville and Marne.
However, the entire M-76 designation was decommissioned and that segment of freeway opened as I-75.
This number was dropped from the Summit Street connector in 1956 after US 24A was extended along a newly opened segment of freeway now used for I-75.
The first segment of freeway to be completed north of the Musquash River was the Parry Sound Bypass, which opened on November 1 , 2001
The remaining segment of freeway connecting Flint with Port Huron opened in 1984 as I-69, and M-21 was shortened to Flint.
Another segment of freeway opened in 1987 in Clinton County between US 127 near DeWitt and TEMP I-69 near Bath.
Similar(47)
Currently, there are two segments of freeway.
In 1967, two segments of freeway opened.
Additional segments of freeway are opened through 1958, and the I-75 designation is applied to the freeway the following year.
Michigan built segments of freeway for the future Interstate in the 1960s, and the state was granted additional Interstate mileage in 1968 to extend I-69 north and east to Flint.
Michigan officials requested a change in 1963, which reversed the two numbers and the subsequent segments of freeway opened northward to Holland and from Grand Rapids westward under the current number.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com