Your English writing platform
Free sign upSuggestions(1)
Exact(4)
"We're outraged that they have again come out with a scheme to delay us," Mr. Flanzraich said.
Ivax officials said Bristol-Myers had created "another scheme" to delay the introduction of a generic Taxol.
Our power saving mechanism uses a scheduling scheme to delay the transmission of NRT data until that RT data is transmitted, and then transmits RT and NRT data in the same frame in order to save power in mobile devices.
The same partisans who use every scheme to delay and impede the Senate from timely confirmation votes boldly express concern that Obama might "undermine" its dysfunctional processes.
Similar(56)
Finally, we extend the scheme to delayed nonlinear systems and prove stability of the closed loop system for proper values of the control parameter.
Former president Mohamed Nasheed, who led the annulled election with more than 45% of the vote, has accused Hassan of scheming to delay the election in order to hold on to power.
Six years ago, the Chilean San José mining disaster left 33 men trapped underground; the whole world was gripped and the 93-year-old Hollywood actor Kirk Douglas remarked that he was reminded of his movie Ace in the Hole, in which he played an unscrupulous reporter covering a similar situation, scheming to delay the rescue and spin the story out.
prevented, obstructed and impeded the administration of justice, and has to that end engaged personally, and through his subordinates and agents, in a course of conduct or scheme designed to delay, impede, cover up and conceal the existence of evidence and testimony.....
In Figure 5, for the linear trajectory in the first path, the FOSB-based tracking scheme is to delay the calculation of the speed estimate until one future observed location is obtained.
Given the clear evidence that crop plant insect interaction is likely to have a significant effect on Bt, from expression of toxicity, to the level of costs incurred and the degree of dominance, it would seem wise to consider host plant factors in the development of any management scheme design to delay the development of resistance to Bt in polyphagous insect pests (Janmaat and Myers 2007).
Delay at MAC layer can be minimized by using a prioritized scheduling scheme which gives priority to delay intolerant applications.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.
Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com