Your English writing platform
Discover LudwigExact(12)
Product pipeline scheduling plans are closely related to the oil depots along the pipeline.
In the future, the authors intend to do more research on an entire optimization of batch migration and oil depot scheduling plans.
Magatão et al. (2004), using a discrete-time expression, solved the issue of pipeline network scheduling plans, which also reflects its preponderance in simplifying large and complex models.
In this paper, an optimal model was established for a single-source multi-distribution oil product pipeline, and scheduling plans were made based on supply.
Based on the systematic optimal theory, a mathematic model in this paper is established to make scheduling plans for oil depots.
Until now, scheduling plans for most large and dynamic oil depot systems are made by field engineers subjectively and from experience.
Similar(48)
Continuous Activity Scheduling Planning Execution and Re-planning.
However, it is complex to make a scheduling plan.
The approximate delivery scheduling plan is shown in Fig. 9.
Open image in new window Fig. 10 Scheduling plan of OD Open image in new window Fig. 11 Scheduling plan of contaminated oil tanks.
Open image in new window Fig. 5 Scheduling plan of oil tanks Open image in new window Fig. 6 Scheduling plan of contaminated oil tanks.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com