Your English writing platform
Discover LudwigExact(2)
The other 50% are omni-channel retailers with a brick and mortar presence; they can power same-day delivery from their local stores if they can integrate systems to sync website orders with local store inventory — and then they need to find a partner that can handle the pickup and delivery within a scheduled window.
When the scheduled window ends at 15:00, Beit Lahyia, Shuja'iya & Zeitoun residents, for their own safety, should not return to their homes.
Similar(58)
After optimization of the sample preparation, injection volume, flow rate andchromatography, the final method used 5-fold concentrated CSF, 1μL partial loop injection, 20 μL/min flow rate, a total of 32 min gradient run with a four minutes scheduling window.
Things started off poorly for Simple when the scheduled maintenance window for the August 2.00 upgrade" went longer than expected.
The live stream above should begin around 15 minutes prior to the scheduled launch window, or at around 11 30 AM PST.
Due to an increase in customer-oriented service strategies designed to meet more complex and exacting customer requirements, meeting a scheduled time window has become an important part of designing vehicle routes for logistics activities.
Subjects were followed prospectively with study visits at weeks 4, 8, 12, 16, 24, 32, 40, and 48, and at time of suspected IRIS, if outside the scheduled visit window.
We included any manuscript conditionally accepted after peer review within the scheduled time window.
For this reason, a scheduling window is essential.
Compared with algorithms proposed in Lin and Wang (2013), the proposed algorithm is able to schedule a feasible sequence adaptively within a short scheduling window and requires little computation.
Each customer needs to set a scheduling window ({mathcal{H}}_{k,s},triangleq,left{ {rho_{k,s}, ldots,sigma_{k,s} } right}) for each shiftable appliance (s in S_{k}), in which (rho_{k,s}) indicates the earliest possible beginning time of the scheduling window, and (sigma_{k,s}) is the last acceptable ending time of the scheduling window.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com