The first peck that occurred after the scheduled delay had passed resulted in delivery of the food reward, followed by a 40 s ITI.
Similar(58)
x...... x o [148] Energy-aware, scheduling delay.
Our analysis accounts for both reservation and scheduling delay components.
Design change exist in construction projects and often cause cost overrun or schedule delay.
Industrial construction projects have been experiencing serious problems such as cost overrun and schedule delay.
Unauthorized deviation from vendor leading to re-work and schedule delay (28.2%). 3.
The weights are adapted periodically, based on the average QoS level, and calculated separately for scheduling delay and transmission rate.
Therefore, depending on the delay contribution of each process, the achieved reduction in scheduling delay using our proposal may have an important impact in packet delay.
Unauthorized deviation from vendor leading to rework or schedule delay Vendors have to design their equipment as per the project-developed philosophies and company design specifications.
Besides, schedule delays can easily be caused by the uncontrolled delivery schedule of the components.
Design errors leading to rework and/or design changes are considered to be the primary contributor to schedule delays and cost overruns in design and construction projects.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com