Your English writing platform
Discover LudwigSuggestions(1)
Exact(1)
Schedule Windows updates to occur at a time when most users will not be online (in the middle of the night, for example), because they will restart your computer.
Similar(59)
In fact, the H/C ratio is 3 for SLMAB, 4 for PM and RMAB, and 5 for AP and DMAB, when hyper-parameters related to the adaptation schedule (window size and type of reward conferred) are included.
Once you've done that, you'll want to add this little bezel to the OLED so you won't be able to see the breakout board through the LEGO schedule window.
Too many applications update in different ways, and on different schedules: Windows Update, Mozilla's built-in updater, Adobe's Update Manager, Java, etc etc.
For this reason, a scheduling window is essential.
Compared with algorithms proposed in Lin and Wang (2013), the proposed algorithm is able to schedule a feasible sequence adaptively within a short scheduling window and requires little computation.
Each customer needs to set a scheduling window ({mathcal{H}}_{k,s},triangleq,left{ {rho_{k,s}, ldots,sigma_{k,s} } right}) for each shiftable appliance (s in S_{k}), in which (rho_{k,s}) indicates the earliest possible beginning time of the scheduling window, and (sigma_{k,s}) is the last acceptable ending time of the scheduling window.
It will be less likely to be scheduled until either the PF scheduling window passes or the cluster pattern rotates back, whichever comes first.
Similar to shiftable and non-shiftable appliances, for each appliance (c in C_{k}), we assume that each customer needs to set a scheduling window ({ mathcal{H}}_{k,c},triangleq,left{ {rho_{k,c}, ldots,sigma_{k,c} } right}), in which (rho_{k,c}) indicates the earliest beginning time of the scheduling window, and (sigma_{k,c}) represents the latest ending time of the scheduling window.
We assume that at the beginning of the scheduling window, all essential information is provided to the optimisation program for computation in the control center.
Based on this theory, our new scheduling objective seeks to maximise the probability of no power generating units in the power system failing during the scheduling window, weighted by the rated power generating capacity of each unit.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com