Your English writing platform
Discover LudwigExact(1)
That is, the day-ahead scheme based on the fuzzy stochastic optimization model is the closest to the optimal scheme (the optimal schedule refers to the scheme obtained by optimizing according to the actual output instead of the prediction).
Similar(59)
It is scheduled through an exhaustive process that usually integrates many disciplines such as optimization, statistics, risk management, etc. Spending so much of a monetary and an emotional investment in an original schedule (referred to as master schedule hereafter) that the scheduler wants to deliver might be a good excuse not to develop a solid 'Plan B'Plan
Correction: July 31 , 2002 Wednesday An article on Thursday about NBC's fall schedule referred incorrectly to the phrase "gay mafia," which arose in a discussion of the absence of new gay characters in the networks' lineup.
As American Idol fumbles to the end of its 15-year run on television, critics and other media types have dug up that old chestnut about how TV executives who once trembled in fear at the thought of Idol's presence on the schedule referred to the show as "the Death Star".
This paper focuses on the information flow in multi-project situation, with the goal of minimizing the influence of information interaction on project schedule, referring the algorithm of Idicula and Fernandez, etc., the clustering object function of the extended DSM was built.
Some exceptions exist, though, such as the continuously updated operating room schedule referred to as "AwareMedia" [ 20].
A subsequent study confirmed these results showing the potential antiangiogenic role of ZA in vivo, with an innovative dose schedule referred to as metronomic for ZA infusion (1 mg every week) instead of the standard regimen (4 mg every 28 days) [ 37].
The term round-robin scheduling refers to a scheduling algorithm designed to provide processor sharing in the case in which multiple threads have the same priority.
Inter-frame scheduling refers to the opportunistic assignment of any free bandwidth in a frame to another link.
Robust scheduling refers both to reliability and to performance fluctuations, both factors that can affect the performance and consequently the effectiveness of a schedule.
The term preemptive, priority-based scheduling refers to the type of scheduling in which a higher priority thread can interrupt and suspend a currently executing thread that has a lower priority.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com