Exact(1)
Phase 1 consists of the first 2 days with a 30% probability of being too ill to continue with regular schedule, phase 2 covers the next 3 days with a 80% probability, and phase 3 is the remaining 5 days with a 30% probability.
Similar(58)
(3) Online scheduling phase: In this phase the schedulability analysis obtained in phase 2 is extended to consider the potential extra workload related to work-stealing. Figure 5 illustrates an example of the schedule of a job of a task, say τ i, on a core, say π j, after the offline scheduling phase.
(2) Offline scheduling phase: during this phase, an execution pattern which does not jeopardize the schedulability of the cores for the migrating task τ 1 is found.
Most of the research considers one scheduling phase.
Our CDSWS has three major phases: initialization phase, cluster forming phase and sleep/wake scheduling phase.
Following the scheduling phase of dedicated frames, the next phase of scheduling is called inter-frame scheduling.
The scheme has two phases: the layered network structure construction phase and collision-free scheduling phase.
The scheduling phase from [108] are organized in estimation and scheduling by [52].
This situation produces loss of information and repetition of the scheduling phase.
The scheduling phase guarantees collision-free data aggregation on the constructed tree.
The first one is the task scheduling phase to determine the proper sequence of tasks.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com