Your English writing platform
Discover LudwigSuggestions(2)
Exact(1)
Instead, architects have to keep a schedule of materials that they continually update as the design progresses.
Similar(57)
A major limitation of many microfluidic platforms is their inability to perform large scale, real time, sensing, routing, or scheduling of the materials moving through them.
Further results show, the proposed approach successfully generated a scaffolding system-loaded BIM model that can be utilized in communication, billing of materials, scheduling simulation, and as a benchmark for accurate field installation and performance measurement.
For example, the IR requires students to analyze overhead costs, determine the optimal job size, schedule production, calculate the amount of materials to purchase, complete material requisitions, update raw materials records, analyze labor time records, complete a job cost record and address critical thinking questions.
The outcome was the termination of his licence to work with Schedule I materials.
CPS will simulate CEEFs behavior with data (conditions of equipments, quantity of materials in tanks, etc). of CEEF and an operation schedule that will be made by the operation team everyday, before the schedule will be carried out.
Completeness of the intervention description was assessed independently by two researchers using a checklist, which included assessments of participants, intensity, schedule, materials and settings.
Reuse of materials.
Total cost of materials?
Assessment of Materials.
Cost of materials.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com