Your English writing platform
Discover LudwigExact(19)
These redesign feedback loops have implications for the schedule, cost and quality of the project.
Such failures may include a delayed schedule, cost overruns, quality, safety and more.
Each team has one loss, so the strength of schedule cost the Trojans a place in the Sugar Bowl.
Through an analysis of design tradespaces, the ESF takes into account performance, schedule, cost, and uncertainty regarding experienced epoch shifts.
The findings indicate that a single algorithm does excel on both dimensions of schedule cost and stability.
Experimental analysis, based on computer simulation, evaluates the impact of environmental and MPS design factors on optimal policy design as measured by schedule cost and stability.
Similar(41)
Additionally, by the day of the disaster, BP was 43 days behind schedule, costing the company at least $40 million more.
When the rig exploded April 20, BP was 43 days behind schedule, costing the company about $1 million a day in rig rental rates, company officials say.
Managing the constraints of scope, schedule, costs including resources, quality, and customer satisfaction fully addresses all the work and activities of any project or program.
Table 3 Operating costs of each scheduling model Type of schedule Optimal Deterministic Stochastic Fuzzy stochastic Day-ahead schedule costs 46078 47831 45870 45939 Adjustment costs 0 − 158 559 290 Total costs 46078 46078 46078 46078.
Unlike an ordinary project at a similar stage of development, the U.S. ITER project has no official "baseline," a document that lays out the schedule, costs, and yearly funding profile.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com