Suggestions(4)
Exact(12)
One edge slides under the bottom row of shingles; the other clips onto the gutter.
One edge slips under the first row of shingles on the roof and the other edge extends just to the outside lip of the gutter, then makes a U-turn back into the space over the gutter channel.
Lay the second row of shingles.
Each row of shingles should overlap the one below it.
Nail a horizontal row of shingles over the drip edge.
The bottom row of shingles must hang past the edge of the roof.
Similar(48)
Place a 6-to-8-inch strip of the metal under the first row of shingling closest to the roof peak.
Continue to nail horizontal rows of shingles onto the roof.
Interlace the flashing around the chimney with the rows of shingles.
These chalk lines will serve as a guide for subsequent even-numbered rows of shingles, and odd-numbered rows, respectively.
The Gutta Guard -- which also uses surface tension to direct water into the gutter -- comes in four-foot sections that can be slid under the first row of roof shingles and then clipped to the front edge of the gutter, he said.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com