Your English writing platform
Discover LudwigSuggestions(1)
Exact(31)
The rail route is expected to open in 2018.
Legislation for the rest of the route is expected to be introduced in 2019.
The route is expected to cost $140m to build, and about $5.5m a year to operate.
In New York City, as in other densely populated areas, the route is expected to be tightly knit.
The present route is expected to be extended to the synthesis of other oxides as electrodes for LIBs.
Service on that route is expected to start next spring and will be financed by a grant from the Lower Manhattan Development Corporation.
Similar(29)
Train operator East Coast said it would run a revised timetable throughout Thursday as large parts of the route were expected to be affected by heavy wind and rain.
Their planned route was expected to take them first to Corowa, then to Narrandera, and finally back to Forest Hill.
The cost of this portion was $10 million (about $inn dollars); at that time, completion of the rest of the route was expected for 2008.
A decision on Havana routes is expected later this summer.
The 25-cent fare on most routes is expected to rise to 45 cents next year, and is already drawing grimaces.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com