Sentence examples for risk management device from inspiring English sources

Exact(1)

· In short, JIE is meant to serve as an uncertainty filtering and risk management device for strategic decision makers in policy and practice alike, as well as students of innovation at large.

Similar(59)

These are actually our most important risk management devices.

But all these are risk management devices that are offered by governments.

Accordingly, OLO meets the full list of harmonized standards that the directive requires, including ISO 13485 (quality management system), ISO 14971 (medical device risk management), CEN 13612 (medical device performance evaluation), and various safety, stability and labeling requirements," he further says on that.

Safety was evaluated by recording adverse events as defined by ISO 14155 standards (ISO 14971 2007, Medical devices -- Application of risk management to medical devices) and by the number of switch back to PSV or to controlled ventilation by the intensivist present at the bedside, whatever the reason.

"Traditionally, risk management for medical devices is about the possibility that the device would not function and, as a result, would injure the patient or disrupt treatment in some way," Fox says.

The paper concludes with recommendations for the improvement of IEC 62366 and ISO 14971, the standard for the risk management of medical devices.

Table 1 Details of the literature referred Time period Search engines and journal database used Keywords 1990 2013 Google scholar Medical product Springer link Medical product development Science direct Medical device ASME Medical device development Inderscience Dental product Taylor and Francis Dental device   Risk   Risk management   Risk mitigation   Risk analysis.

Methods: A failure modes and effects analysis identified hazards and harms potentially caused by use errors; risk-control measures were implemented to ensure acceptable device use risk management.

This unavoidable fact is the reason for extraordinary efforts regarding quality and risk management as early as during the development of new devices within the medical device industry.

The risk assessment tool was described to GPs as a management device to help stratify patients into those who might become high consulters in the long term, and thus may aid future decisions about management of these patients.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: