Sentence examples for risk installation from inspiring English sources

Exact(1)

The paper shows, with a practical application, how the hazard identification and evaluation phase of the Safety Management System SMSS) in a major risk installation (as defined by EC Directive CEE 96/82 (Seveso II) is the sizing criteria for the whole SMS, with its procedures.

Similar(59)

The Seveso accidents and the subsequent european regulations raised the attention to the land use planning around major risk installations.

In the last decades, moreover, the problem of the technological accidents induced by natural disruptive events (Na-tech) acquired an increasing relevance; although several methodologies to assess this kind of risk were developed, their adoption is still not explicitly requested in the regulations, neither related to major risk installations.

It is the hope that the combined AHP FCE model will provide valuable information pertaining to environment and hazard installation risk assessments for basin systems.

This analysis focused exclusively on the emissions associated with inputs to insulation manufacturing and fuel production, and did not consider dimensions such as occupational risks, installation risks, or indoor air quality.

In this paper, the combined analytical hierarchy process fuzzy comprehensive evaluation (AHP FCE) model was built to assess the risk for hazard installations of the Nansi Lake Basin.

A particular importance is given to the risk associated to Major Hazard Installations, which are regulated by very stringent and comprehensive international laws and standards, such as the Seveso Directives/COMAH in Europe, and the EPA Risk Management Program Rule in USA.

Consult your mechanic or local (authorized) auto electrician in case your make or model has special needs or risks (software installations, or risks from improperly disconnecting the battery).

Planning of the work activities plays an important role in managing the activities and installation risk by identifying hazards and ensuring measures are planned for.

Afterwards, traditional consequence models are briefly discussed aiming to identify the weakness of each one that supports the specification of the model used in the consequence analysis of a specified case, which is evaluated by providing the data to estimate the total risk of the installation.

"Part of the work is taking risks with the installation," Lipman says as she prepares herself mentally to remove the wooden braces from the glass settee.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: