Your English writing platform
Discover LudwigSimilar(60)
A compound of project cost index and resource leveling index makes the total objective: Total objective = IL T × T T basis + IL σ × σ σ basis Open image in new window (2).
where IL T is the importance level of the project time index, IL σ is the importance level of the resource leveling index, T is the project time, σ is the resource leveling index, Tbasis is the basis amount of the project time index, and σbasis is the basis amount of the resource leveling index.
Leu et al. (2000) proposed an algorithm that can effectively provide the optimal or near-optimal combination of multiple construction resources as well as starting and finishing dates of activities subjected to the objective of resource leveling.
These approaches contributed to resource allocation and resource leveling.
Project time and resource leveling index optimization are the objectives.
Resource availability constraints and resource leveling are typical real-life scheduling problems.
There are some resource leveling indexes (Elazouni and Metwally 2007; Leu et al. 2000).
For example, Easa (1989) developed an improved tabu search model to solve resource leveling problems.
Kastor and Sirakoulis (2009) evaluated the effectiveness of resource leveling tools of three popular packages by comparing the results when leveling two real construction projects as case studies.
In other words, both of the objectives, project time minimization and resource leveling, should be considered.
Other advantages of resource leveling include simplified resource tracking and control, lower cost of resource management and improved opportunity for learning.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com