The solitary, repetitive project gives me time to think and ruminate about where my life is headed.
Similar(59)
Rachmat et al. (2009) investigated stochastic simulation on repetitive projects to incorporate activity performance uncertainty in look-ahead scheduling.
For repetitive projects, smooth work flow of productive resources is necessary to minimize or eliminate interruptions and idle time with the objective of reducing costs.
This paper presents an intelligent system MoCCAS (a monolithic construction computer aided system), which is a comprehensive decision support tool for flexible construction site management in repetitive projects.
The discussion is centered on the modeling procedures of repetitive processes with the special focus on the synchronization of resources and workflow continuity, which is crucial in scheduling and managing repetitive projects.
Although the repetitive scheduling method (RSM) is more visual, straightforward, and easier to use, the network model is more commonly accepted by both owners and contractors as a means for modeling repetitive projects.
The study offers a conceptualization of the construction processes designed for the monolithic construction computer-aided system (MoCCAS) that enables a flexible approach to managing repetitive projects within a dynamically changing construction environment.
Repetitive-Projects Evaluation and Review Technique (RPERT), which is a simplified software, will generate the expected project completion probability of a specified/certain duration (contract duration).
At the end of the paper, an illustrative example will be presented to demonstrate and verify the applications of the proposed software (OSS) to an optimization expressway of repetitive construction project.
Estimating expected completion probability of any repetitive construction project with a specified/certain duration including repetitive identical activities by using program evaluation and review technique is the most essential part in construction areas since the activities were had optimistic, most likely and pessimistic durations.
This paper focuses on the calculation of expected completion probability of any repetitive construction project within a specified/certain duration (contract duration) by using Line Of Balance technique (LOB) in case of single or multiple number of crews integrated with Program Evaluation and Review Technique (PERT).
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com