Your English writing platform
Discover LudwigSuggestions(1)
Exact(2)
These reliability activities cover work on the drawing board, in its initial manufacturing stages and during field erection.
The developed ROM-Tree consists of: (1) a new reliability analysis structure, (2) reliability metrics, and (3) reliability activities.
Similar(58)
It should be noticed that compared with advanced strategies such as next-generation sequencing and transcriptional profiling analysis, q-PCR has limitations both on data size and reliability (activity in vivo).
Apart from homework, which was the out-of-school sedentary activity with the highest level of reliability, the activities included in the measure of sedentary behaviour were leisure-time, discretionary activities and, as such, were unlikely to be as regular and temporally-defined as structured activities.
Failure rate estimation is one of the most accurate (and most expensive) reliability analysis activities.
Reliability engineering activities are those that design-in quality, uptime, and failure avoidance.
The approach contributes by integrating the component-level reliability evaluation activities (i.e. the heuristic reliability estimation, model-based reliability prediction and model-based reliability measuring of components) and the system-level reliability prediction activity to support the incremental and iterative development of reliable component-based software systems.
Also the reliability analysis activities like prediction, assessment and demonstration as well as de-rating analysis, Failure Mode Effects and Criticality Analysis (FMECA) and worst-case analysis are carried out by SR groups during various stages of project realisation.
These techniques allow the system performance data and any relevant associated information to be used collectively to calculate the probabilities of various types of hypotheses that are formulated as part of reliability assurance activities.
Since this should have been obvious more than 50 years ago, at the onset of formal reliability engineering activities, several reasons are proffered for the widespread and protracted misinterpretation of even the most basic and simple!—conceptual and practical differences between nonrepairable and repairable items.
Minutes per week spent in different categories of physical activity (mean ± SD) by patients in the reliability group, activity scores from the dual measurements (mean ± SD) and reliability of the total activity scores, as well as reliability of the scores on separate questions of the SQUASH (Spearman correlation coefficient).
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com