Sentence examples for railway section from inspiring English sources

"railway section" is a correct and usable phrase in written English.
You can use it to refer to a specific part of a railway system such as a line or track, for example: "This railway section has been closed due to ongoing repairs."

Exact(7)

This northern trunk continued as the sub-Carpathian Romanian railway line running toward Bucharest and, farther on, to Orşova, which, in turn, was linked by a Hungarian railway section with Budapest and thus with Vienna.

The speed for passenger trains in the railway section varies between 80 and 140 km/h.

During the working days more than 50 trains are passing this railway section, out of which 14 are passenger trains.

With reference to the mechanical and geometric values of a typical high-speed railway section adopted in Italy, the two previous approaches allow developing some general considerations.

In the computations considered in this paper, the traction current is assumed to be taken to trains from only one station in a railway section.

In 1989 and 2000 2005, strong geomagnetic storms caused the problem that northern midlatitudes in Russian and Gorky electrification railway section were observed much operation abnormity in the track signal system.

Show more...

Similar(53)

The results can provide the bases for controlling sand hazards at different-altitude railway sections.

Honglianghe River section of Qinghai Tibet Railway and Danghe River section of Dunhuang Golmud Railway were selected as the typical representatives of high- and low-altitude sand hazard sections, respectively, to understand the sand hazard law of different-altitude railway sections.

The floating slab track is effective in isolating loading above 10 Hz, which might present in some railway sections with irregularities.

The work discussed in this paper builds on this work where utilisations of railway sections are analysed similarly using simulation modelling software [4].

In order to compare the measurement results of the RSMV with that of the prototype trolley, a comparison test was performed, showing that, for those railway sections with the overall track stiffness less than 150 kN/mm, the results were almost the same, while for those hard sections, the results are quite different.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: