Sentence examples for projected interactions from inspiring English sources

Exact(3)

The general goal of the facility layout problem is to arrange a given number of facilities to minimize the total cost associated with the known or projected interactions between them.

The facility layout problem is concerned with the arrangement of a given number of rectangular facilities so as to minimize the total cost associated with the (known or projected) interactions between them.

The first data set is composed of projected interactions based on interolog mapping.

Similar(57)

The facility layout problem (FLP) is one of the design problems involving the assignment of facilities (e.g., machines, departments) to planar region (e.g., a plant), so as to achieve the objectives such as to minimize the cost of projected interaction between facilities or to maximize the closeness rating, etc.

Project interactions and constraints determine which project roadmaps are admissible.

In the end, we show which project interactions and domain-specific constraints must be considered when compiling BPM- and process-level projects into project roadmaps (Sect. 4.5).

They must comply with intra-temporal project interactions (e.g., two projects must not be implemented in the same period), inter-temporal project interactions (e.g., a project requires another project to be implemented first), and domain-specific constraints (e.g., limited budgets).

Relating to the periods of a multi-period planning horizon, each tuple component contains a set of projects that have been scheduled to a distinct period in line with the project interactions and domain-specific constraints at hand.

Moreover, as SystemC-AMS is also being extended to cover other physical domains within the CATRENE CA701 project, interactions with these domains will be possible, for example, with electromechanical or optical parts, should they be part of the system.

The optimal portfolio selection stage then establishes the project portfolio that best meets the performance indicators, considering project interactions (e.g., mutual exclusion, predecessor/successor) and further constraints (e.g., latest finishing dates, restricted budgets) (Kundisch and Meier 2011; Liu and Wang 2011).

Organizations that plan to apply the planning model also require some areas of their BPM capability to be developed beforehand, including process metrics and enterprise process architecture Another issue with impact on applicability is that the planning model requires collecting and estimating input data regarding processes, projects, interactions, and constraints.

Show more...

Your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: