Your English writing platform
Free sign upSuggestions(5)
The phrase "project start date" is correct and commonly used in written English.
You can use it when discussing a specific project and mentioning when it will begin. Example: "The project start date for our new marketing campaign has been moved to next Monday."
Exact(7)
The database lists reservoir rock and fluid properties in addition to other project attributes related to oil saturations, incremental recovery, demography, and project start date.
Such a long-term average rate is already applicable for a REDD+ REL, and can be extrapolated to the forest cover remaining at project start date [20-24] [20-24]1). Figure 2 DeforesTablen mapped by the most conservative option of 100% CLASlite v3.0 ArtiFigureemover.
For this you need to provide: a name for the project, its overview (it will be part of the RD), the selection of the responsible client and software engineer (previously registered), the project start date, the status (initially it must be "open" to indicate that the project is in progress) and the subdomain selection, to guide the software engineer in future reuse of requirements.
The company allows users to post their renovation, decoration or repair jobs to the site and then posts that job to a handful of reviewed and qualified contractors, designers, etc. Sweeten's technology chooses these professionals based on a number of details, including project start date, cost estimate, location, style and project duration.
A 2003 update to the report identified a project start date of 2007, with full closure in 2008 and a reopening in 2009.
Such a long-term average rate is already applicable for a REDD+ REL, and can be extrapolated to the forest cover remaining at project start date [ 20- 24] (Table 1).
Similar(53)
The actual project start dates to 25 November 2009.
That the projected start date is just before the end of Johnson's second term as mayor has fuelled criticisms that the proposals are being rushed through to form his legacy to London.
Under New York state law, buyers in a new development have the right to get out of their contracts if the developer does not close at least one unit within a year of the originally projected start date.
That September, the final route was set with a projected start date in 1997.
The IRS is only considering a delay of one to two weeks from the original projected start date for IRS processing of 2013 tax returns.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.
Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com