Sentence examples for program validation from inspiring English sources

Exact(6)

program validation survey reports and other formal evaluations of the performance of providers of services, including the reports of follow-up reviews, except that such reports shall not identify individual patients, individual health care practitioners, or other individuals.

It discusses the use of lightweight threads for the implementation of asynchronous agents that perform introspective monitoring of the application program for such purposes as program validation, performance analysis, or automatic performance tuning.

An ideal development process includes a test-requirements analysis, a test-requirements document, simultaneous test generation, fixture construction, and test documentation, followed by program validation against product design and test design before production ramp-up.

Variations in the program validation may differ between countries and ethnic factors are known to be determining factors that can influence the decision about and outcomes of adjuvant treatment.

For LightCycler program validation the antiparallel duplex probes were measured at pH 6, 7 and 8 and the parallel triplex probes were measured at pH 5, 5.25, 5.5 and 5.75.

The SOL program validation soon after its development [ 34, 43] has shown high docking quality: good rediscovery of a ligand native position for 80 protein-ligand complexes and good detection of active inhibitors among large set of inactive ligands by sorting by scoring function.

Similar(54)

In this paper, ELDAMeth, a simulation-based methodology for DAS, which enables rapid prototyping based on visual programming, validation, and automatic code generation for JADE-based DAS, is presented.

This paper discusses the following issues: analytical versus numerical solution techniques, graphical versus numerical solution techniques, teaching numerical methods and programming, validation and comparison of regression models, and determination of the number of significant digits in the reported results of numerical solutions.

program VaLHiDD (Validation of Historical Daily Data).

The finite element (FE) models of these tests were prepared and FE analysis were conducted using LS-DYNA program for validation study.

The developed computer program after validation is used to calculate the horizontal tensile strain at the bottom of the bituminous layer (BL) and the vertical compressive strain at the top of the subgrade.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: