Your English writing platform
Discover LudwigExact(5)
Our main contribution is s-PERC: a new practical distributed proactive scheduling algorithm.
The application of simulation as proactive scheduling tool in construction projects is hampered by limited accessibility of proper input data, though, because of long project duration, the often temporary organization and multidisciplinary nature of such projects.
Monte-Carlo simulation analysis has been discussed in project management literature as tool for proactive scheduling and to gain better insights into projects which are characterized by a high level of complexity and uncertainty, such as the design phase of prefab building projects.
The proactive scheduling was used to build baseline schedules depending on redundancy, where a protective time cushion between jobs' finish time lower bounds and their deadlines was added to guarantee job deadlines.
Structured counseling and proactive scheduling of provider appointments might be used for high-risk patients to reduce the acute care utilization.
Similar(55)
"Till date, Auto Scale only supported reactive (utilization-based) and proactive (schedule-based) scaling.
Another issue that sets the #BCSM tweetchat apart from other chats is that the moderators are very proactive about scheduling guest experts that can help community members learn more about many aspects of life with breast cancer.
According to Marty McLendon, chairman of the Flint River Soil and Water Conservation District, which is trialling the technology: "[It means] we can make proactive irrigation scheduling decisions on the fly".
Future development of clinic interventions to reduce no-show rate should consider costs of no-shows compared to costs associated with developing a multi-factorial approach that includes proactive planning, scheduling, reminding and rescheduling when patients miss an appointment.
Although phone reminders were found to be effective for the most part to increase patient attended appointments, impact on clinic outcomes, as with other interventions in this focus group, were mixed and only a few studies discussed proactive appointment scheduling or management.
For example, an airline company can regularly monitor machine and equipment health on the Predix platform and establish a proactive maintenance schedule to ensure safety, minimize downtime and extend asset life.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com