Your English writing platform
Discover LudwigExact(2)
Real estate require the correct holder to acknowledge or dismiss the merchant's predetermined cost before other potential purchasers are offered a similar arrangement and real estate attorney who has experience arranging privileges of first refusal.
Real option itself is "as the right, but not the obligation, to take an action (e.g., deferring, expanding, contracting or abandoning) at a predetermined cost, called exercise price, for a predetermined period of time – the life of the option" [16].
Similar(58)
It comes to more than 5percentt of the discretionary budget, that part that excludes predetermined costs like interest payments on the national debt and programs like Social Security.
Although the precision of the Census was not predetermined, and costs were estimated to be in the billion-dollar range, major advances were possible on a schedule that could contribute usefully to the understanding required to manage an environment under increasing pressure.
Components of the concept are a comprehensive environmental information base with prioritised goals and targets (available in Germany from landscape planning) and new remuneration models, which complement conventional compensation payments that are based upon predetermined measures and cost.
Because we assume that station locations are predetermined, the access cost might be omitted.
The ultimate outcome of the election is no less predetermined, but the costs of obvious, large-scale ballot rigging are much higher and a fabricated outcome like that in Egypt would be counterproductive in Turkey.
The allowance could be either 24% of modified total direct costs or a percentage equal to 95% of the most recently negotiated fixed or predetermined rate for the cost pools included under "Administration" as defined in Section B.1, whichever is less.
Further, we suggest an analytical optimal ADT design method for more efficient reliability demonstration by minimizing the asymptotic variance of decision variable in reliability demonstration under the constraints of sample size, test duration, test cost, and predetermined decision risks.
Especially in the conceptual design phase some design-characteristic aspects such as hierarchy of parameters, modularity of the design should be analyzed, because in this phase the largest part of the later resulting product costs is predetermined or even fixed.
As in the previous study, the number of cells which should be formed is predetermined to 3, then the cost for forming three cells in two periods is equal to 3 × 2 × 20,000 = 120,000.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com