Sentence examples for pile location from inspiring English sources

Exact(6)

After construction of piles, it is necessary to prepare an as-built pile location plan.

Typically, a licensed surveyor would develop the as-built pile location plan.

The parameters that were considered include the magnitude of initial imperfections, residual stresses, slenderness of the pile, location and extent of the corroded region, and severity of corrosion.

A parametric study was carried out to establish the excavation induced pile behaviour varying the depth of the excavation, soil properties, wall support system, pile fixity conditions and pile location with respect to the excavation.

This study utilizes three dimensional finite element modeling to better understand the main parameters that affect the response of laterally loaded pile groups (2 × 2 and 3 × 3 pile configurations) including sand relative density, pile spacing (s = 2.5 D, 5 D and 8 D) and pile location within the group.

The results indicate that, Under the condition of soil-rock compound stratum in Xiamen city, when the steel pipe pile location away from the edge of deep foundation pit 2h (h: depth of deep excavation), the displacement of the steel pipe pile was generally small.

Similar(54)

Piezocone (CPTu) results are also available from adjacent pile locations.

This will help you select the leaf pile locations more strategically, and will give you a center or specific location that every rake can be directed towards.

The planar model was used to identify zero resolved shear stress isolines, rather than the neutral axis, as controlling the soft pile-up location, and source spacing as limiting the slip band spacing in the observed size effect; strengthening was much greater in the source-limited regime.

All samples exhibited the Stroth-type crack initiation and the number of pile-up locations between the initiation facet and surrounding propagation facets was related to the life variability.

A parametric study is presented with the aim to suggest the minimum number of boundary elements to guarantee the accuracy of a BEM solution, for typical pile soil relative stiffness values as a function of the pile diameter, the location of the interface of a two-layered soil and of the stiffness contrast.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: