Exact(6)
Secondly, a mathematical model, aiming at maximizing served populations per construction cost, is proposed to optimize multi-hub location based on the selected candidate nodes.
This approach relies on analytical methods, especially the Improved Displacement Coefficient Method (IDCM), as well as statistical data such as the number of buildings per construction period, building material, and structure height.
One explanation for the low significance levels of both, the net wage and the net replacement income effect, might be a multi-collinearity phenomenon since the replacement income is per construction highly correlated with the nominal net wage.
Type A comprises two joint sub-assemblages with joint detailing as per construction code of practice in India (IS 456-2000), and Type B comprises two joint sub-assemblages with joint detailing as per ductile detailing code of practice in India (IS 13920-1993).
The results show that the total life-cycle GHG emissions per construction length of the entire Shanghai Metro are 109,642.81 t CO2e (with a service life of 50 years), and materials production, materials transportation, on-site construction, operation, and maintenance generated, respectively, about 4.1%, <0.1%, 0.4%, 92.1%, and 3.4% of the total emissions.
Such aggregate (higher order) objects are per construction resulting of the properties of first order elements together with interactions.
Similar(51)
This paper aims to provide an explicit analysis of this based on a weight-per-construction-area method.
It accuses the industry of "blatant tax dodging", calculating that for a £700-per-week construction worker, HMRC picks up more than £200 in tax when they are directly employed, but less than £150 when they go through an umbrella company.
Chinese investors are paying a steep $25 million-per-mile construction cost because the system suspended at 300 feet above ground is three times the height of the standard model that Aerobus anticipates making elsewhere.
On Friday at 10 p.m., the first two Wilshire ramps will be closed for 90 days of 24-hour-per-day construction, NBC reports.
Deletion of the relA and spoT genes and intactness of flanking regions were determined by sequencing; antibiotic resistance markers were removed after construction (pers. comm. Dr. K. Tedin).
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com