Sentence examples for pavement achieving from inspiring English sources

Exact(1)

Also, composite pavement achieving the design criteria may be selected as a design section for heavy duty area.

Similar(59)

They found that internal curing pavement achieved 7-day flexural strength up to 90 100%% of the required 28-day flexural strength due to an improved hydration process.

Compaction is a crucial topic for asphalt mixture in that the success of mix design greatly depends on the compaction method being used, and the asphalt pavement achieves the required density also through sufficient compaction efforts in the field.

In Juárez people once again drive with their windows rolled down and eat their burritos on the pavement, but achieving the same results elsewhere will not be easy.After the Caribbean cocaine-smuggling route was shut down in the 1980s, Colombia's drug lords turned to Mexico, whose 2,000-mile 2,000-mileh the United States, the world's bordert drug market, made it a convenient stepping-stone.

This article uses life-cycle assessment to evaluate the role of long-life pavements in achieving environmental goals.

The new pavement also incorporated fly ash and less cement, allowing the pavement to achieve maximum strength faster than pure concrete.

To survey the feasibility of solar pavement to achieve the electrical energy through solar cells, I-V (current-voltage) measurements were carried out to record the current and voltages of the solar cells embedded in the pavement under different conditions and determine their power conversion efficiency (PCE).

Comprehending the effects of specific wavelengths in micro-texture is essential in the design of pavements to achieve adequate skid resistance.

The results suggest that this framework provides a way to systematically include data in the evaluation of the outcomes of pavement management decisions towards achieving sustainable objectives.

When this process is made at ambient temperature (Cold Recycled Mixes – CRM), more advantages are brought about with, above all, the reduction in energy consumption and emissions during in plant production and laying, in addition to the actual possibility of achieving durable pavement layers.

It is shown that, with an input power of 350 W/m2, the temperature of pavement surface can achieve an increment of 4.63 °C and the 2.7 cm thick snow can be melted within 2 h, which is just for melting snow at this condition.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: