Your English writing platform
Discover LudwigSuggestions(1)
Similar(59)
"As a guy in packaging, I get all the questions — there's nothing worse than going to a cocktail party where someone's asking why they can't get into their stuff," said Ronald Sasine, the senior director for packaging procurement at Wal-Mart.
Later, McNamara introduced another change in contracting total-package procontracting total-package
In the software package configuration being implemented at present, only the core modules of the package procured by FAO would be used (general ledger, accounts payable and receivable, procurement and fixed assets).
Prior to recruitment of patients, providers in the intervention arm received training on the recognition of depression, the delivery of the manualized intervention package, the procurement and documentation of support and supervision using mobile phones, and the use of the automated electronic support and documentation system.
The 100 kV negative hydrogen ion source based Diagnostic Neutral Beam (DNB) injector, a part of Indian (IN) Procurement Package for ITER.
A subsidiary of Foster Wheeler AG's Global Engineering and Construction Group will undertake basic design engineering package and engineering, procurement and construction management (EPCm) services for the Emission Improvement and PSA-3 project at Thai Oil Public Co Ltd's refinery in Sriracha, Thailand.
For the design and development proposal of the European procurement package of the Water Detritiation System (WDS) for ITER, an experimental WDS was installed at the Tritium Laboratory Karlsruhe (TLK) to investigate the process and various components of the system.
Major progress in tritium research in the Republic of Korea began when Korea became responsible for ITER tritium Storage and Delivery System (SDS) procurement package which is part of the ITER Fuel Cycle.
As DNB is a procurement package for INDIA, an ITER approved Indian test facility, INTF, is under construction at Institute for Plasma Research IPRR), India and is envisaged to be operational in 2015.
Korea Domestic Agency KODAA) is developing a nuclear fusion fuel storage and delivery system (SDS) as one of the Korean procurement packages.
Three policy strategies to manage variations between planned and actual costs are discussed: improving funding authorization estimates, improving contingency policies, and using economies of scale in procurement packaging.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com