Suggestions(5)
Similar(59)
Overlapping Schedules On ARNOLD SCHWARZENEGGER'S calendar for today are two entries involving RUDOLPH W. GIULIANI.
Overlapping schedules even allowed fans to make a double-header out of crucial games for each team.
A contemporary scheduling tool, the dependency structure matrix (DSM), aids in generating the shortest (overlapped) schedule based on dependencies among the different design disciplines.
We call this type of scheduling as non-overlap scheduling.
For non-overlap scheduling, each resource block of the superframe is scheduled to one sensor exclusively.
Not surprisingly, the results demonstrate that the SDP outperforms the non-overlap scheduling.
This part shows the comparison between the SDP-based scheduling and the non-overlap scheduling (marked by "NS").
From simulation results, it can be concluded that the proposed SDP completely outperforms the non-overlap scheduling.
Fig. 4 Mean packet transmission delay of each sensor in four priority classes: SDP vs. non-overlap scheduling.
For priority-ware packet collection, SDP-based scheduling achieves lower mean waiting delay for each priority class than non-overlap scheduling.
In this subsection, we analyze the transmission delay performance of non-overlap scheduling and compare it to delay performance of the SDP-based scheduling.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com