Your English writing platform
Discover LudwigExact(5)
In our problem setting, the objective to minimize the overall completion time which is called the makespan.
The first two moments of X∗, the overall completion time for this alternative model, can then be found using the same approach as for X.
Our schedule considerably reduces overall completion time under the assumption that some part from every communication phase can be efficiently overlapped with atomic, pure tile computations.
In our approach, we are interested not only in tile size and shape according to the required communication to computation ratio, but also in overall completion time.
If some of the tasks become delayed, the completion time of the last job in the batch may be some while after the majority of the jobs have finished, thus seriously affecting the overall completion time of the batch.
Similar(55)
We observed on average 10.2% decrease in overall task completion time compared to the baseline protocol.
Moreover, overall task completion time was to be as minimum as possible.
It was observed that the haptic guidance feature further reduced the overall task completion time.
Overall task completion time and their findings were evaluated by analysing the recorded interaction logs and the captured findings.
Overall, the completion time of this query for DB10000 is well within the stipulated time limit for all the queries attempted (results not shown).
The makespan is the overall task completion time, which is the time difference between the start and end of a sequence of tasks on a resource [27].
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com