Sentence examples for outage between from inspiring English sources

Exact(3)

The relative comparison of key performance indicators (KPIs), such as the average user throughput or the user throughput at 5% outage, between versions of a gradient scheduler with different fairness degrees is insensitive to the network load under the full buffer traffic model, but sensitive under the finite buffer traffic model.

Hence, the results show that the relative comparison of KPIs, such as the average user throughput or the user throughput at 5% outage, between two different α values of the α-fair gradient scheduling algorithm, is insensitive to the network load under the full buffer traffic model.

Moreover, the relative comparison of KPIs, such as the average user throughput or the user throughput at 5% outage, between versions of the α-fair gradient scheduling algorithm (with different fairness levels) is insensitive to the network load under the full buffer traffic model, but sensitive under the finite buffer traffic model.

Similar(57)

Because of the uneven distribution of weather factors for time and space, there are obvious differences for transmission line outages between various regions in each month.

All of the researches above only consider the impact of operational conditions on each single component of power system and do not take into account the coupling of outages between multiple components.

The utility saw a surge in outages between 3 and 3 30 a.m., when strong rain and wind hit the area.

The proposed on‐off control protocol guarantees the minimum outage probability between those of the AF relaying and RT schemes.

In Fig. 6, we examine the outage probability between DSSC full-duplex and the conventional full-duplex systems with γ th =7,κ=3,7,11 when the relay uses AF protocol.

Figure14 compares the outage performance between the PFPPC scheme and the Gaussian approximation (GA) for four channels case (m1 = m2 = m3 = m4 = 0. 5).

In summary, the optical repeater performance outage falls between that of a no-relay system and a relay system with orthogonal allocation.

Therefore, we can assume that the outage probability between the source and any of the K relays is given by Equation 11.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: