Your English writing platform
Discover LudwigSuggestions(1)
Exact(21)
3. Funding matters The lack of available finance for new development or refurbishment is the biggest barrier to implementation of nearly zero energy housing.
The social enterprise recruits occupants for temporarily empty premises, often earmarked for demolition or refurbishment, for an average weekly occupancy fee of £60.
However, none of those responsible for its day-to-day running, upkeep or refurbishment - not the Venice city council, the theatre's general manager, or the building firms contracted to work there - had maintained even the most basic of safety measures.
This in turn means that some universities will want to invest in building or refurbishment programmes or fund new teaching posts, in order to enhance their attractiveness to potential students.
A federal e-waste bill, in fact, was put forward in Congress in May, but environmental advocates have lambasted an exception in the draft for equipment being shipped for "repair or refurbishment".
Ryan pointed out at the time that this did not constitute 'flipping' her second home since she had not made any claims for redecoration or refurbishment on her south London flat that would have allowed her to claim the maximum to which she was entitled.
Similar(39)
Figures are broken down into new builds and extensions or refurbishments of existing buildings.
They are related to the national level and include company profits, taxes and income from wages that are generated, e.g. through planning and implementation of renewable energies or energetic refurbishment.
Determining the proper storage locations for potentially thousands of products is one major task that faces the warehouse manager during the design of a new warehouse or the refurbishment of existing facility.
Therefore, resilience to climate change, susceptibility to internal heat gains and the impact of future heat waves, should be an integral part of any new building or building refurbishment design process.
These most influential stakeholders in the decision-making process are the designers (prime contracting: thermal and design engineering, architect, etc).. To complete this study, some operational suggestions are proposed to improve the consideration of UHI constraints in decision process, concerning the implementation or the refurbishment of the targeted building.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com