Suggestions(1)
Exact(2)
Three weeks pass before they are moved to another onshore system that uses the area bay waters as a rich food source.
DAC on the tension leg platform manages to achieve loads comparable to that of the onshore system.
Similar(57)
The results show that the offshore power transmitted to the onshore AC system is approximately 3320 MW.
The DC grid is designed for collecting offshore wind power, supplying offshore load (e.g. oil or gas platform) and integrating them to the onshore AC system.
In this technique the leading and trailing edge of the signal above a certain threshold are time stamped and the corresponding times are sent to the onshore acquisition system.
Once onshore, the system slowed and turned northeastward.
Within hours of moving onshore, the system dissipated.
Within hours of moving onshore, the system had substantially weakened.
Once onshore, the system quickly weakened and ultimately dissipated over Assam early on October 12.
Within hours of moving onshore, the system had substantially weakened, and by February 5, Geralda had degenerated into a land depression.
Within hours of moving onshore, the system had substantially weakened, and by February 5, Geralda had degenerated into a land depression, and it became extratropical three days later.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com