Ai Feedback
Exact(4)
If we use N machines, the parameter vector is divided into N non-overlapping partitions.
T(n) is the time taken to run on n machines.
Hence the finishing time, FT, of a complete schedule with n machines can be estimated as FT = max T m 1, T m 2, …., T mn.
Rezg et al. (2004) proposed an integrated method for preventive maintenance and inventory control of a production line, composed of n machines subject to failures without intermediate buffers.
Similar(54)
The compositions of the batch gas samples were quantified with GC/FID on an Agilent Technologies 6890 N (G1530 N) machine equipped with a CoraPlot Q capillary column (CP7554, 25 m length, 0.53 mm inner diameter and 20 µm film thickness).
The contour size of the nominal machined surface S N, machining requirements, and the nominal tool path T N are shown in Fig. 13.
Open image in new window Fig. 2 Transition diagram for n-machines.
Tsarouhas (2015) developed analytical probability models for an automated serial production, which consists of n-machines in series.
Open image in new window Fig. 1 Schematic representation of a bufferless production line with n-machines in series.
The line which is considered as a system consists of n-machines in series with no buffers between them, see Fig. 1.
Analytical probability models for an automated system that consists of n-machines in series with common transfer mechanism and control system are developed.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com