Exact(1)
It is important to note, however, that estimates of wSHR and wWIS were based on 2-3 rats of each strain, because p = 0 for most of these rats in most schedules.
Similar(59)
Most scheduled business is inevitably postponed.
"Most Schedule C employees were -- virtually all -- asked to submit their resignations.
The strikes, most scheduled to last 24 hours, were organized to coincide with the presentation of a pension reform bill to Parliament on Tuesday.
Pop and Jazz Most scheduled concerts will go on as planned, although the Electric Light Orchestra has canceled its concert on Saturday at the PNC Bank Arts Center in Holmdel, N.J.
Practically all of the dozens of models of digital audio players on the market today, including most scheduled to be available in the near future, require a computer to load them with music.
As most scheduling heuristics, list scheduling assumes fully connected homogeneous processors and ignores contention on the communication links.
The key idea of our CAC scheme is based on the fact that most scheduling services are with adaptive QoS requirements, e.g., maximum and minimum rates.
In addition, most scheduling problems handled by GP are dynamic problems where jobs will arrive randomly over time and their information is only available upon their arrivals.
The key idea of our dynamic CAC scheme is based on the fact that most scheduling services are with adaptive QoS requirements, e.g., maximum and minimum rates.
However, when adjusted for drug availability, event rates of abuse were lower than most Schedule II opioids studied, but were not the lowest.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com