Your English writing platform
Discover LudwigExact(60)
To prevent failure of mooring lines in modern position mooring (PM) systems, position moored vessels are kept within a small distance from a desired reference position.
An extensive parametric study is performed to investigate the effect of different configurations (length of mooring lines and draft) on the performance of the moored floating breakwater.
The existence of 'optimum' configuration of the moored floating breakwater in terms of wave elevation coefficients and mooring lines' forces is clearly demonstrated, through a decision framework.
It is found that the number of hinge joints and mooring lines have a direct effect on the performance of the cable-moored array of floating breakwaters.
Like Windfloat, it is loosely anchored to the sea bed with mooring lines.
Since then the companies have installed additional mooring lines on drilling rigs and production platforms.
One system consists of 16 mooring lines (four by four) and another one consists of 12 mooring lines (four by three).
The draft of the floating breakwater is changed through the appropriate modification of mooring lines' length.
The device is a tension leg structure with four vertical mooring lines.
A cylindrical, floating WEC with four spread mooring lines is chosen as case study.
Part of the mooring systems are underwater buoyancy elements that are attached to the mooring lines.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com