Your English writing platform
Discover LudwigSuggestions(2)
Exact(5)
Yale FES Professor Gaboury Benoit installed hydrologic monitoring instruments to measure the performance of the bioswales in reducing flow rates during storm events.
To correct these measurements for the effects introduced by atmospheric fluctuations, the Observatory contains a group of monitoring instruments to record atmospheric conditions across the detector site, an area exceeding 3000 km2.
Monitoring Data Construction project teams normally set up various types of monitoring instruments to collect the necessary data to monitor the status of different environmental variables.
Generally, construction project teams will set up monitoring instruments to control and monitor the overall environmental status, especially during the construction of retaining walls, main excavations, and when groundwater is involved.
After taking measures to reduce the spread of contamination, IDPH uses monitoring instruments to assess airborne concentrations and the extent of contamination.
Similar(55)
Yet, researchers developing new programs face the question: how shall we design our monitoring instrument to respond to the local challenges.
For instance, develop a monitoring instrument to measure the quality of the PETAS program as a self-improvement tool for kindergartens and as an evaluative tool to maintain an acceptable level of quality by MNE as external evaluator.
The monitoring instruments installed to check the vertical and horizontal displacements, stresses, excess pore water pressures, depth to the groundwater table and strains in the reinforcing material included inclinometers, settlement plates, total pressure cells, standpipe piezometers, vibrating-wire strain gauges and fibre optic strain gauges.
Before the year 2000 or so, most monitoring instruments had to be deployed from ships.
Dense on-land and sea-floor networks of geophysical monitoring instruments able to detect any potential movement of tremor and slow slip toward the locked and primed portion of the plate boundary fault.
Once a well is completed, logging and monitoring instruments have to be capable of operating at ambient downhole conditions.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com