Your English writing platform
Discover LudwigExact(2)
The optimization aims to find each stage's design with minimum expected lifecycle cost considering all possible scenarios.
Most consequence-based decision models, including those based on minimum expected lifecycle cost, have supported engineering decisions in many contexts but address the influence of risk perception on those decisions only to a limited degree.
Similar(58)
In this study this problem is investigated based on minimization of expected lifecycle cost.
Optimal seismic design level can be prescribed based on the minimization of the expected lifecycle cost or the expected utility theory.
Another novelty is in how the concept of flexibility is exploited to deal with uncertainty and improve expected lifecycle performance (e.g. cost).
A case study reveals a reduction in the expected lifecycle cost for an optimized system compared with the all-in-single-stage system and global coverage constellation.
Compare that to traditional satellite shops, which require multiple years of development to ensure that they won't crap out early in their expected lifecycle.
Note that all of the above expectations are only the minimum expected of all participants.
Splitting off the wholesale unit would be the minimum expected".
The minimum expected cost rule is employed to determine the optimal inspection interval.
The minimum expected count is.06.06
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com