Your English writing platform
Discover LudwigExact(1)
The potential of green concrete for applications in practice is shown by the structural performance of graded concrete members being loaded in flexural tests.
Similar(59)
The tensural displacement amplifier does not have the potential problems buckling may cause because all the compliant members are loaded in tension.
The remaining fifty-one residents, together with eighteen employees and a handful of their family members, were loaded onto a bus and into a few smaller vehicles, which took them to a sister facility, Autumn Village, in Beulaville, an hour and a half away.
We cannot accept that". That might win over a few more voters on the terraces but there will still be many in the "Bosman ruined football" camp who think this is simply a union fighting for more money for its members, and in this case the members are loaded.
As part of the regular AgBase updates (done every 2 months), new annotations from other GO Consortium members are loaded into the BI and the GO files (including GO IDs, term names, etc) are reloaded so that curators have access to updated GO term information for their curation.
One hot and humid Saturday morning at Tasty Catering, a supervisor, Steven, noticed one of his team members was loading Indiana-bound equipment onto a truck headed for Wisconsin.
Moreover, the member is loaded both axially, transversely and simultaneously subjected to internal and external pressures.
When a reinforced concrete member is loaded gradually in pure tension, cracking of the concrete will take place in one or more places along the length of the member when the tensile stress in the concrete exceeds the tensile strength of the concrete.
On a late February afternoon at the Willimantic Food Co-op, Sharon Williams of Windsor Locks was on her weekly visit for 10 half-gallons of raw milk, and Kathleen King of Columbia, an eight-year member, was loading up on faro, garbanzo bean flour, sunflower seed butter, kale and daikon.
The plane that crashed Wednesday, a Tupolev 154 leased by Caspian Airlines, based in Tehran, was bound for Yerevan, the Armenian capital, with 153 passengers and 15 crew members, and was loaded with fuel, Iranian news services said.
For both load directions, the tower main members that were loaded in compression showed slight out-of-plane deformation at the design load, which was also the maximum load during the test.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com