Your English writing platform
Discover LudwigSuggestions(1)
Exact(1)
In annually flooded (AF) stands (n = 5), flooding occurred every year, reaching maximum water heights of 1.5 to 3.5 m with inundation lasting for 2 to 5 months.
Similar(59)
However, the maximum water height at the surface (0.8 m) is smaller than in the case of the larger source.
The inset shows the month of maximum daily water height for the years 1930 1974, after which the prior to extensive water management and the water-gate remained closed.
The following approximate formula was obtained [10]: P = frac{7}{8}rho k_{h} gsqrt {h(h - y)}, (1 where y denotes the water heights, P is the maximum hydrodynamic pressures at height y, h is the reservoir depth, (rho) is the unit density of water, k h is the seismic acceleration coefficients in the horizontal direction, and g is the acceleration of gravity (9.8 m/s2).
The comparison between our baseline simulation and a simulation where the flooding is disabled by increasing the dike height reveals differences in maximum water levels locally reaching 1.0 m.
Conditional sampling of the crest heights seaward of the deck gave a normalized probability distribution similar to that of the maximum water level measured on the deck for each overtopping event.
Maximum water saturation.
Maximum water deficit.
However, the maximum base shear occurs at full water height.
Here, the normalization is done with respect to the maximum base shear, i.e., (V_b) corresponding to the water height H = 3 m for firm site.
A maximum of 80% As removal was achieved within 500 min at the lowest water height.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com